Tag Archive for De Drentse Monden en Oostermoer Wind Farm

Less protection lights required for De Drentse Monden en Oostermoer WF

The developer of the De Drentse Monden en Oostermoer Wind Farm announced only half of the originally planned protection lights on the 35 wind turbines are required. The developer has received permission from the Human Environment and Transport Inspectorate for several modifications. The originally planned two rows of four lights around the tower, at 45…

Start installation first turbine De Drentse Monden en Oostermoer WF

On 8 July, a start was made on the installation of the first wind turbine at the De Drentse Monden en Oostermoer Wind Farm. This took place along the Drentse Mondenweg at 1e Exloermond. Providing the weather remains favourable, the installation could be completed by the end of this week. Start of construction commenced after…