Tag Archive for Sif

Foundation suppliers Borssele 1+2 announced

Ørsted announced the suppliers for the monopiles and transition pieces for the 752 MW offshore wind farm Borssele 1+2. Sif and EEW SPC received the contract for the delivery of half of the 94 monopile foundations for the Siemens Gamesa 8 MW turbines while Danish Bladt Industries and EEW OSB will deliver 35 transition pieces,…

Successful first offshore installation Slip Joint connection

On 30 September the Slip Joint Offshore Research (SJOR)-consortium successfully installed the DOT wind turbine in the Prinses Amaliawindpark offshore wind farm, off the coast of IJmuiden. The turbine was installed on a monopile foundation using the Slip Joint, an alternative connection between the turbine and the foundation based on friction, where the weight ensures…

Sif Group ziet productie dalen door kapotte walsrol

Sif Group, producent van stalen funderingspijlers voor windmolens en de olie- en gassector, zag de productie in het eerste kwartaal van 2018 met 18 procent dalen ten opzichte van het vorige kwartaal. Volgens een ‘trading update’ van het bedrijf bleef de productie vooral achter door een defecte walsrol. Daarnaast kampte Sif met problemen aan de…

Offshore windterminal op Maasvlakte 2

Op de Tweede Maasvlakte gaan Sif Group en Verbrugge International een offshore windterminal bouwen. Met het Havenbedrijf Rotterdam is hiertoe een principeovereenkomst gesloten. Sif gaat op de terminal monopiles voor offshore windparken en de olie- en gasindustrie produceren. Verbrugge neemt de logistieke afhandeling op de terminal voor zijn rekening. Naar verwachting is de faciliteit in…